the Business Forum and
the Economic Partnership
in Brighton & Hove
Homepage    BCRP Intranet    Funding    Events    Knowledgebase    Links    About us     Contact us
Key projects
Crime
reduction
 


Inward
investment
information
 


Licensee
Forum
 

Workforce development 

Transport
 

Business &
climate
change

Property &
Development sites

Business
Improvement
Districts

Housing
 

Strategy
 

Consultation opportunities
 

Brighton & Hove Business Forum
8-11 Pavilion Buildings, Brighton, BN1 1EE
Tel: 01273 735442
Email: info@brighton
business.co.uk

© Brighton & Hove
Business Forum

News - 9 April 2013

Rampion Wind Farm application accepted for examination by Secretary of State

After withdrawal of the original application for further consultation the application for up to 175 turbines and a capacity of 700MW has been presented to the Planning Inspectorate for consideration.

If built, the wind farm could generate enough electricity to supply the equivalent of around 450,000 homes.

Notices are now being placed in local and national newspapers under Section 56 of the Planning Act 2008, setting out how the community can register their opinions with the Planning Inspectorate. The public will be able to view E.ON’s final proposals and register as an ‘interested party’ with the Planning Inspectorate during the period from 3 April – 11 May 2013.

The main concerns highlighted through the consultation were the visual impact of the wind farm from the Sussex Heritage Coast, the impact on fishermen and sea users and the impact of the onshore cable route on the South Downs National Park.

E.ON has worked to reduce the wind farm area by almost a quarter of the area consulted upon and to around half that originally awarded by The Crown Estate in January 20102. This has been achieved by removing an area to the southeast of the site, therefore reducing the view of the wind farm visible from the Heritage Coast by over 35%.

This change has also led to a reduction in the maximum number of proposed turbines by 20, meaning the project could feature between 100 and 175 turbines depending on the model selected.

In response to concerns of the impact on the South Downs National Park, E.ON has put forward a number of solutions. These include a ducted method of cable installation to reduce the time required for trenching and restoration, tailored construction to reduce the impact on the chalk grasslands at Tottington Mount and a commitment to communicate with users, informing them of the impact on Public Rights of Way.

Following concerns raised about semi-natural ancient woodland, outside the National Park, minor realignments of the cable route have been introduced to avoid ecologically sensitive areas. E.ON has also listened to concerns about traffic on Bob Lane highlighted by residents living near the proposed new substation and has confirmed that there will be no construction access from Bob Lane after the initial construction site is established. In response to calls to lessen the visual impact of the substation, tree planting is planned along the northern and southern boundaries of the substation site to reduce visual impact.

E.ON has also undertaken further engineering work, resulting in a reduction in the maximum number of gravity base foundations that may be required. This will play a key part in minimising the impact on wave heights which the surfing and wave sports community were concerned about. With this change wave heights will only be impacted by around 3%, compared to the potential 22% featured in the original proposals.

A final decision on whether consent will be granted will not be made until summer 2014.

Click here to download Rampion Final submission details


Read related items on:
Energy
Green technology
Planning
E.on


Browse our business Knowledgebase or search by keyword


Headlines

19 February 2018
House Price update Q4 2017
19 February 2018
What would you do in a crisis? 19 February 2018
The investment journey for high growth entrepreneurs 9 February 2018
Make Change Count 2018 - helping rough sleepers in Brighton & Hove 8 February 2018
Brighton Technology Company Paxton Announces Recipients of New Scholarship Programmein Association with the University of Brighton 8 February 2018
Cyber London Accelerator Invites Summer 2018 Entries 8 February 2018
Innovate UK Launches Strand 2 Emerging and Enabling Technologies Sector Competition 8 February 2018
Success In Sussex As Food And Drink Heroes Crowned Winners 8 February 2018
UK Games Fund - Fourth Round Open to Applications 8 February 2018
Innovate UK & Prince's Trust Launch Young Innovators' Programme 6 February 2018
Brighton & Hove Food Partnership launches 'Kit Out The Kitchen' crowdfunding campaign 2 February 2018
Brighton & Hove Council and Crest Nicholson win £15m government funding to kickstart King Alfred project 1 February 2018
Could a Utilise Plus Programme grant help you? 1 February 2018
Shoreham Port Facilitates Huge Operation 18 January 2018
IUK Announces Collaborative R&D Funding for Connected and Autonomous Vehicles Simulation 18 January 2018
Renault-Nissan-Mitsubishi Launches $1 Billion Corporate Venture Capital Fund for Next Generation Mobility 17 January 2018
PORTlife #17 Newsletter Out Now 17 January 2018
Over £19,000 raised for Burning the Clocks 2017 11 January 2018
Brighton Main Line Improvement Project: Planned closures in October 2018 and February 2019 11 January 2018
Come on in! Fairtrade Fortnight 2018 8 January 2018
Sussex Business SkillSnap targets hospitality industry skill shortage 3 January 2018
House Price update 2017 Q3 20 December 2017
£14.35 Million European Regional Development Fund Launched 19 December 2017
Leading the way - Sustainability in Action masterclass 15 December 2017
Brighton is among the best places to start a business due to their strong growth factors 15 December 2017
GTR consultation ends 20th Dec 2017 13 December 2017
Ethical Food StartUp Programme - Idea Generation Workshop 12 December 2017
Utilise Plus launch programme of energy efficiency grants and business support for SMEs 11 December 2017
City Centre Vacancy Rates Drop Slightly From Sept 5 December 2017
Innovate UK Announces Sector Competitions in Manufacturing and Infrastructure Systems 5 December 2017
GDPR, steps to early compliance 1 December 2017
The 29th Sussex Business Awards 2017 Winners Announced 1 December 2017
Old tech gear? Give IT a new lease of life 29 November 2017
Driving for Better Business Campaign launches 29 November 2017
ARKA Funerals sponsor Burning the Clocks 2017 with 'In Memory' lanterns 27 November 2017
Govia Thameslink launches third consultation phase on once-in-a-generation timetable restructure 23 November 2017
Coast to Capital Launches Brighton Mainline Alliance 22 November 2017
Calling all UK companies that have transport, parking and commuting issues to address 15 November 2017
Start-up Challenge Business Competition Offering £10,000 Investment to Young Entrepreneurs 15 November 2017
IUK Announces £10 Million Innovation Loans Infrastructure Systems Funding Competition for UK SMEs